Leave Your Message
200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225
Track Link
Products Categories
Featured Products

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

  • Model NO. All models available
  • Type Dozer
  • Application Excavator
  • Certification CE, ISO9001: 2000
  • Condition New
  • Occasion Contrucction, Earthmoving, Mining
  • Material 40mn2, 35mnb
  • Technology Forging
  • Hardness Depth 8-12mm
  • Warranty Time 12 Mouths
  • MOQ 1 PC
  • Payment Term 30%T/T in Advance, The Balance Before Shipment
  • Delivery 25-30 Days
  • Transportation by Sea
  • HRC 55-60
  • Size Normally;Customized
  • Transport Package Standard Export Wood Pallet
  • Specification Standard
  • Trademark Z. K. M
  • Origin Quanzhou, China
  • HS Code 8431490000
  • Production Capacity 100000 Per Month
  • Package Size 125.00cm * 100.00cm * 150.00cm
  • Package Gross Weight 600.000kg

product detail

Product Description

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for  Heavy Machinery Track Chain DH220LC-2 DH220LC-3 SOLAR220LC-3 SOLAR225
200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225
Material 40mn2, 35mnb
Part No. KM3807/49;KM782/49;LH1075/49;931963;990046;200103-00096A;2272-6101;272-00054;K1011228;3380411H91;
9272-6018;9202850;81EM-27010;81N6-26600;E15698B1M00049;E40208C0M00049;AT152088;20Y-32-00023;
20Y-32-00024;20Y-32-K1511;1082-02170;1182-00010;1182-00011;14530361;VKM782/49HDV
Finish Smooth
Colors Black, yellow, or customized
Technology Forging
Surface Hardness HRC55-60, deepth: 8mm-12mm
Warranty time 12 Months
Delivery Time 25-30 days

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

Embark on an extraordinary journey of engineering excellence through our premium bulldozer undercarriage spare parts. These components epitomize robust sophistication and enduring strength. With an unwavering commitment to excellence and unparalleled reliability, we ensure your heavy machinery operates at its peak, propelling your projects to spectacular success and ultimate achievement.


Important Notice: We wish to clarify that all manufacturer names and symbols used are solely for identification purposes. This statement does not imply any affiliation or authenticity with the mentioned manufacturers, as we are committed to upholding complete transparency.
200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225
Production Process
200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225
200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225Founded in 2013 in the dynamic city of Quanzhou, China, Quanzhou Zhongkai Machinery Co., Ltd. (zkmparts/zkucparts) stands at the forefront of excellence in crafting superior undercarriage components. Our extensive product line, featuring track rollers, track chains, idlers, top rollers, and sprockets/segment rims, caters to a wide range of machinery needs. Whether it's nimble mini-excavators or colossal mining machines, we support nearly every major brand worldwide with unmatched precision and quality.

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

200103-00096A 2272-6101; 72-00054 Forged Track Link Assembly for Heavy Machinery Track Chain Dh220LC-2 Dh220LC-3 Solar220LC-3 Solar225

 

Why Choose Us?

1. Enjoy the benefits of our unwavering 100% quality assurance. We cater to both small and sample orders and offer adaptable pricing structures for bulk purchases, perfectly aligning with your budgetary strategies to ensure maximum value.

2. Leverage our profound expertise in the realm of excavators and bulldozers, enhanced by a comprehensive inventory crafted to meet diverse needs with seamless precision.

3. Our steadfast dedication to manufacturing superior quality products is reinforced by an extensive warranty, providing you with unmatched peace of mind and security.

4. Experience unrivaled customer service, offering professional guidance and steadfast support throughout your entire purchasing journey.

5. Take advantage of our highly competitive pricing, delivering exceptional value that simplifies and supports the attainment of your purchasing goals.

6. Our expansive inventory ensures swift and efficient solutions to meet your immediate needs, guaranteeing seamless and uninterrupted operations.

FAQ

How could I ensure the part would fit my machinery?
Pls send us the correct model number/machine serial number/ any numbers on the parts themselves. Or measure the parts give us dimensions or drawings.

What is the payment term?
Generally, 30% deposit T/T in advance, and the balance before the shipment.

What is the lead time?
FOB Xiamen or any Chinese port: 25-30 days. If there are any parts in stock, our delivery time is only 0-7 days.

What kind of package do you offer?
Normally we use the export standard wood pallets. If any special requirements, we can discuss them.

What about Quality Control?
We have a perfect system for checking the quality of our products. Our team checks the products and the way they are made very carefully. They do this at every stage of the production process. This makes sure that the products are safe when they are put in the container.

Leave Your Message